Project Details | |
---|---|
Client | DLA+ Architecture & Interior Design GUND Partnership |
Location | Clarion, PA |
Size | 102,000 sq. ft. – Existing 53,000 sq. ft. – Additions 9,600 sq. ft. – Rec. Pool |
Cost | ~$45 million |
Services | HVAC, Plumbing, Fire Protection, Electrical, Power, Lighting, Data / Telecom, Energy |
OVERVIEW. The design includes renovations to the existing 102,000 sq. ft. Tippin Gymnasium to include classrooms athletic training center, offices, multi-purpose auxilliary gym, wrestling room, two-story, glass enclosed strength and conditioning facility, and locker rooms. Two new and separate facilities totaling 53,000 sq. ft. including a 45,000 sq. ft. natatorium and an 8,000 sq. ft. fitness and dance studio will be constructed on either side of the existing recreational center.