• 2014-04-22_Hot Metal View 1
  • 2014-04-22_Hot Metal View 2
Project Details
Client WTW Architects
Location Pittsburgh, PA
Size  135,000 gsf
Cost  $26 million
Services  HVAC, Plumbing, Fire Protection, Electrical, Power, Lighting, Data / Telecom, Security, Energy
LEED  In Pursuit

OVERVIEW. Hot Metal Flats is a residential development located in the SouthSide Works neighborhood of Pittsburgh. The building is designed to meet LEED Silver Certification and to encourage sustainable living. Hot Metal will include 116 stacked one-bedroom and 2-bedroom apartment units on four floors with one parking level beneath. Features will consist of private lounge and bar, outdoor lounge with sundeck and grills, fitness center, mudroom with pet washing stations, and outdoor space.

Loftus Menu